City Power’s Weekly Planned Maintenance Across the Network
BY : CHANON LECODEY MERRICKS ONLINE EDITOR KASiBC_AFRiCA
City Power’s Weekly Planned Maintenance Across the Network (04 – 10 May 2026) Time: 15:00
City Power would like to advise customers that planned maintenance will be conducted across various Service Delivery Centres (SDCs) during the week of 04 to 10 May 2026. This work forms part of ongoing efforts to service critical infrastructure, address ageing components, and improve overall network reliability.
The planned maintenance schedule is as follows: • At Clear Water Switching Station in the Roodepoort SDC, planned maintenance is scheduled for Monday, 4 May 2026, from 08h00 to 16h00, affecting Clear Water Mall. • On Tuesday, 5 May 2026, several SDCs will undergo planned maintenance.
At Moffat Substation in the Reuven SDC, work will take place from 08h00 to 16h00, affecting Fresh Produce, Market Boundary 1, South Hills Estate Cab Ground 1, and South Hills Estate Cab Ground 2. At Modderfontein Substation in the Midrand SDC, planned maintenance is scheduled from 08h00 to 14h00, affecting Ammonia.
At Houtkoppen Substation in the Randburg SDC, work will take place from 09h00 to 17h00, affecting Boxer Road, Derby Drive, Dexter Road, Bellairs Drive, Hyperion Drive, and Blandford Road.
On Wednesday, 6 May 2026, planned maintenance will be conducted at Vorna Valley Substation in the Midrand SDC from 08h00 to 14h00, affecting Vorna Valley (all streets) and Kyalami Estate (all streets).
On the same day, planned maintenance will also take place at Groblersrus Switching Station in the Roodepoort SDC from 08h00 to 16h00, affecting Groblersrus Flats and parts of Witpoortjie.
On Thursday, 7 May 2026, planned maintenance will continue at Vorna Valley Substation in the Midrand SDC from 08h00 to 14h00, affecting Vorna Valley (all streets) and Kyalami Estate (all streets).
At Orlando (Industria) Substation in the Hursthill SDC, planned maintenance is scheduled for Saturday, 9 May 2026, from 09h00 to 17h00. Areas affected include Watt Street, George Stott, Parson Street, Bunsen Street, Industria North, Springbok Street, Maraisburg Road, Breweries Riverlea, Bunsen Street South, Slovo Crosby Standby, Slovo Crosby No.1 and 2, Vega Street No.1, 2 and 3, Riverlea, Bosmont, Longdale, Lowenthal, Paarlshoop, Maraisburg, Noble Street, Industria West, Industria South, Yeast Pro No. 2, Eastern Industria, and Maraisburg North.
Planned maintenance is necessary to ensure the continued safe and reliable operation of the electricity network. Much of the infrastructure across the city has been in service for several decades and requires routine servicing and replacement to prevent failures.
Through this work, City Power is able to identify and address potential faults before they result in unplanned outages, which are often more disruptive and take longer to restore. This work also supports efforts to strengthen network performance, manage load more effectively, and maintain safety standards for both employees and the public.
Customers are reminded that supply may be restored at any time once work is completed and are urged to treat all electrical points as live. City Power regrets the inconvenience that may be caused and thanks customers for their cooperation as the organisation continues to invest in maintaining and stabilising the electricity network.
For further information or to log a service request, customers can contact the City Power Call Centre on 011 490 7484 or the toll-free number 0800 202 925, or visit www.citypower.mobi
NEWS , AUDIO , VIDEO , EVENTS , TOURS , STORES
YOUR ADVERTS
Promote your Business KASIBC_AFRICA REACH MILLIONS of viewers DAILY!
Advertise With #KasiPeople

No comments:
Post a Comment
KASIPEOPLE